Working closely with the City of Emporia and Quik Trip, BG Consultants developed a long-range development plan for a large-scale mixed-use development on the north side of the I-35 & US-50 interchange and west of Graphic Arts Rd. in Emporia, KS. 

BG Consultants completed a boundary survey and a topographic survey for the site. These were the base elements of the preliminary and final plat, the site grading plan, and the design of public infrastructure to support the development. Planning included a complex traffic study which was ultimately used by the City and property owner to negotiate direct access to KDOT’s interchange.  Stormwater analysis was also included in the planning as the project directly impacted DWR regulated floodways and Waters of the U.S. regulated by the U.S. Army Corps of Engineers.

Phase 1 of the site development process included design of the public infrastructure improvements.  Street, storm sewer, waterline and sanitary sewer construction plans were developed and approved through the City of Emporia and KDOT. 

The project included 20,600 Cu. Yds. of Common Excavation, 10,374 Sq. Yds. of Aggregate Base (AB-3), 2,816 Tons of HMA (Base course) asphalt, 545 Tons of HMA (Surface course) asphalt, 2,502 Sq. Yds. of 10” Concrete pavement, 360 Sq. Yds of 9” Concrete pavement (Stamped/ Colored), 5,360 Lin. Ft. of Curb & Gutter, 21 - Type 22 Curb Inlets, 504 Lin. Ft. of 15” Storm Sewer (RCP), 381 Lin. Ft. of 24” Storm Sewer (RCP), 1,241 Lin. Ft. of 48”Storm Sewer (RCP), 1,393 Lin. Ft of 12” Sanitary Sewer Main (SDR 26, 6 - new Manholes, 1,285 Lin. Ft. of 12” Waterline (C-900), 2 -12” Butterfly Valves, 4 – Fire Hydrants

 

Services Provided
Site Development & Subdivisions
Highways and Roads
Stormwater
Surveying
Construction Administration